That finding says a lot about where contractor management is heading in Canada. CMS platforms are no longer being viewed only as compliance tools. For many organizations, they are becoming part of a broader strategy to improve operational efficiency, reduce risk and support stronger business performance.
That is one of the key themes in Veriforce’s report, An ROI Perspective on Contractor Management Systems. The report looks at how Canadian organizations are using CMS, where they are seeing measurable value and which challenges continue to create friction.
For companies evaluating their own approach, the findings offer a useful benchmark for understanding where the market is heading.
This level of adoption shows how central CMS platforms have become for contractor oversight in Canada.
As organizations manage more contractors, worksites and documentation requirements, they need a consistent way to track contractor status and reduce gaps in the process. Common areas managed through a CMS can include contractor qualification status, health and safety documentation, site-specific requirements or permit authorization.
When these details are spread across spreadsheets, inboxes or paper records, teams have less visibility into who is ready to work and what still needs attention. A CMS helps bring that information into one place, giving teams a clearer view of contractor readiness and where action is still needed.
The report found that 66% of surveyed leaders rank operational efficiency as their top contractor management priority.
That finding says a lot about how organizations are thinking about CMS value. Leaders are looking at how their systems can help reduce manual follow-up, shorten approval cycles and make contractor information easier to access.
For example, if a site team needs to confirm whether a contractor has the right documentation before work begins, delays can happen when information sits in different places. A CMS gives teams a more centralized view of contractor readiness, which can help reduce back-and-forth and support faster decisions.
Efficiency also matters across multiple worksites. A process that feels manageable at one site can become difficult to control when different locations use different requirements, tools or approval steps.
The report also points to a stronger business case for contractor management systems.
More than 70% of executives reported operational savings of at least 10% from their CMS.
Those savings can come from several areas:
Less time spent chasing documentation
Fewer delays caused by missing or expired records
Faster permit and approval processes
More consistent contractor vetting
Better visibility across sites and teams
For organizations reviewing their current contractor management approach, the report provides a useful view of what peers are prioritizing and measuring.
It can help teams ask better questions, such as:
How does our CMS adoption compare with the wider market?
Are our processes consistent across worksites?
Where are we still relying on manual follow-up?
Are we measuring CMS value beyond compliance?
Could our current process be slowing down contractor readiness?